Western Farmers Electric Coop lineman work to install a high voltage electrical switch at a substation near Perry, OK. They are working on the line that carries 67,000 volts per phase, using a techni
Western Farmers Electric Coop lineman work to install a high voltage electrical switch at a substation near Perry, OK. They are working on the line that carries 67,000 volts per phase, using a technique they call "bare handed" ie working with live voltage.
- Filename
- 2013-0823-0091.jpg
- Copyright
- James Pratt
- Image Size
- 7360x4912 / 7.9MB
- www.james-pratt.com
- Contained in galleries
- Power generation