Show Navigation

James Pratt Photography

  • Home
  • Portfolio
  • Archive
    • All Galleries
    • Search
    • Cart
    • Lightbox
    • Client Area
  • Blog

James Pratt Photography

Less Info
  • Facebook
  • Twitter
x
Add to Lightbox Download

Western Farmers Electric Coop lineman work to install a high voltage electrical switch at a substation near Perry, OK. They are working on the line that carries 67,000 volts per phase, using a techni

Lineman install electrical bypass lines so the high voltage power will pass through this line while a switch is installed.

Filename
2013-0823-0046.jpg
Copyright
James Pratt
Image Size
7360x4912 / 3.7MB
www.james-pratt.com
Oklahoma Living bare hand cooperative electricity lineman
Contained in galleries
Power generation
Lineman install electrical bypass lines so the high voltage power will pass through this line while a switch is installed.