Western Farmers Electric Coop lineman work to install a high voltage electrical switch at a substation near Perry, OK. They are working on the line that carries 67,000 volts per phase, using a techni
Lineman install electrical bypass lines so the high voltage power will pass through this line while a switch is installed.
- Filename
- 2013-0823-0046.jpg
- Copyright
- James Pratt
- Image Size
- 7360x4912 / 3.7MB
- www.james-pratt.com
- Contained in galleries
- Power generation
